Dubai Metro Gold Line route stations and timeline guide

Dubai has officially unveiled the Dubai Metro Gold Line, and it’s already being called the city’s biggest transport project to date. While it’s still in the planning stage, key details like route, stations, and timeline are now emerging.
If you’re curious about how this new line will reshape travel across the city, this guide breaks it all down in a simple, practical way using the latest available information.
What is the Dubai Metro Gold Line
The Dubai Metro Gold Line is a newly announced underground metro corridor led by the Roads and Transport Authority.
It is designed to connect historic districts with fast-growing residential communities and reduce pressure on existing metro lines.
Key project facts
- Total length around 42 km
- Fully underground, reaching depths of up to 40 metres
- Estimated cost of AED 34 billion
- Around 18 stations planned
- Expected to serve 1.5 million residents
This makes it the largest transport project ever announced in Dubai.
Dubai Metro Gold Line route overview
The Dubai Metro Gold Line will create a new corridor across the city, linking older areas with modern suburban developments.
Start and end points
- Starting point: Al Ghubaiba
- Ending point: Jumeirah Golf Estates
This alignment connects traditional districts with newer residential hubs.
Key route highlights
- Passes through 15 strategic areas
- Connects to more than 55 major real estate developments
- Designed to improve east-west connectivity across Dubai
The line is expected to significantly reduce travel time between central and suburban zones.
Dubai Metro Gold Line stations list
While the final station names are not officially confirmed, multiple reports and planning documents reveal the likely station corridor and key areas.
Proposed Dubai Metro Gold Line stations
The line is expected to include around 18 stations across the following areas
- Al Ghubaiba
- Bur Dubai
- Al Satwa
- Business Bay
- Meydan
- Al Quoz
- Dubai Hills
- Al Barsha South
- Jumeirah Village Circle
- Jumeirah Village Triangle
- Dubai Production City
- Dubai Sports City
- Arabian Ranches
- Dubailand
- Global Village
- Majan
- Tilal Al Ghaf
- Jumeirah Golf Estates
These locations reflect both high-density zones and fast-growing suburban communities.
Important note
- Station names may change before final approval
- Exact station count and spacing will be confirmed later
- Interchange stations are expected at key hubs
Interchange connections with existing metro
The Gold Line will integrate with the current Dubai Metro network to improve connectivity.
Expected interchanges
- With Dubai Metro Green Line at Al Ghubaiba
- With both lines at Bur Dubai area (BurJuman interchange)
- With Dubai Metro Red Line at Business Bay
It will also connect with the UAE’s national rail network
- Future link to Etihad Rail
Dubai Metro Gold Line budget and scale
The project reflects Dubai’s long-term investment in infrastructure.
Financial overview
- Total cost
- Around AED 34 billion
- Network expansion
- Adds about 25 percent to the metro system
- Capacity projection
- Up to 465,000 passengers daily by 2040
This scale shows how critical the line is for future mobility.
Dubai Metro Gold Line timeline
The Dubai Metro Gold Line is still in early stages, but a general timeline is now emerging.
Key milestones
- Announcement
- April 2026
- Planning and design
- Ongoing
- Construction start
- Expected around 2027 to 2028 (estimated)
- Expected completion
- Around 9 September 2032
Dubai typically follows strict timelines for major infrastructure projects, so progress is expected to move steadily.
Why the Dubai Metro Gold Line matters
This new line is not just an expansion. It fills key gaps in the current transport network.
Key benefits
- Better connectivity in older districts like Deira and Bur Dubai
- Direct metro access to growing communities like Dubailand and JVC
- Reduced congestion on Red and Green Lines
- Improved property value and development along the route
It also supports Dubai’s long-term vision for sustainable urban mobility.
FAQs about Dubai Metro Gold Line
Is the Dubai Metro Gold Line confirmed
Yes, it was officially announced in April 2026 as part of Dubai’s major transport expansion.
How many stations will the Gold Line have
Around 18 stations are planned, but final numbers may change.
What areas will the Gold Line connect
It will run from Al Ghubaiba to Jumeirah Golf Estates, covering central and suburban areas.
What is the project budget
The estimated cost is about AED 34 billion.
When will the Gold Line open
The target completion date is around 2032.
Conclusion
The Dubai Metro Gold Line is set to transform how people move across the city. With a 42 km underground route, 18 planned stations, and connections to major communities, it will bridge the gap between old Dubai and its expanding suburbs.
Even though it’s still in the planning phase, the route and station plans already show its impact. Whether you’re a commuter, investor, or visitor, this is one project worth watching closely.